Upload a CSV file to quickly add multiple nodes to this timeline. Review the column reference below before importing.
CSV column reference
Required columns:
- title — Node title displayed on the timeline.
- date — Date formatted as
YYYY-MM-DD.
- time — Time or short label shown beside the node.
Optional columns:
- description — Additional information shown in the node details.